Astaro RED Burn in Test for 250 beta appliances
Astaro RED (Remote Ethernet Device) is a revolutionaliy new way to connect branch offices back to headquarters. Within the closed beta program, 250 Astaro RED appliances have been deployed for real live testing. To ensure the unusual high quality of Astaro products, a 48 hour burn in test was set up: All 250 devices where hooked up to a central Astaro Security Gateway 625 appliance and traffic was sent through them generated by 10 Astaro Security Gateway 120 appliances. Task: Pretest new Astaro RED devices for beta users Challenge: Test a lot of devices within a short timeframe Solution: Try firing them up all at once Appliances: 2 ASG625, 10 ASG120, lots of Astaro REDs Network: 16 Switches, 543 LAN cables, 2 Webcams Power: 2 circuits, 37 power strips Manpower: 6 people, 3 hours, lots of visitors
Video Rating: 5 / 5
LOL very nice the „frequent answer to female visitors“
Was that a HP 4000M Switch I saw there?